E-mail: mail@demolink.org
8901 Marmora Road Glasgow, D04 89GR
Phone: +1 800 559 6580
Newsletter Sign Up
STIMULUS
© 2012 : Privacy Policy
TRAINING/CERTIFICATION
Goldex
search
Stimulus’ quality management system requires quality indoctrination training for all personnel. Additional training and documentation are required based on specific technical job requirements. Stimulus provides training as part of the preparation for certification.
Donec porta diam eu massa. Quisque diam lorem, interdum vitae, dapibus ac, scelerisque vitae, pede. Donec eget tellus non erat lacinia fermentum. Donec in velit vel ipsum auctor pulvinar. Proin ullamcorper urna et felis. Vestibulum iaculis lacinia est. Proin dictum elementum velit. Fusce euismod consequat ante. Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Pellentesque sed dolor. Aliquam congue fermentum nisl. Mauris accumsan nulla vel diam. Sed in lacus ut enim adipiscing aliquet. Nulla venenatis. In pede mi, aliquet sit amet, euismod in, auctor ut, ligula.
MECHANICAL SERVICES TRAINING/CERTIFICATION PROGRAMS
NDE/NDT TRAINING/CERTIFICATION PROGRAM
Ultrasonic Thickness Measurement
Ultrasonic Thickness Measurement
Emissions Control Services
Emissions Control Services
- Ultrasonic
- Ultrasonic
Field Machining Services
Field Machining Services
- Shear Wave
- Shear Wave
Hot Tapping, Line Stopping, Freeze Stopping, HiStopping
Hot Tapping, Line Stopping, Freeze Stopping, HiStopping
- Phased Array
- Phased Array
Onstream Leak Repairs
Onstream Leak Repairs
- Time of Flight
- Time of Flight
Packing Extraction
Packing Extraction
Magnetic Particle Inspection
Magnetic Particle Inspection
Repacking
Repacking
Liquid Penetrant Inspection
Liquid Penetrant Inspection
Technical Bolting Valve Repair Services
Technical Bolting Valve Repair Services
Electronic Magnetic Testing
Electronic Magnetic Testing
- Eddy Current Inspection
- Eddy Current Inspection
- Remote Field Inspection
- Remote Field Inspection
HEAT TREAT
TRAINING/CERTIFICATION PROGRAM
- Alternating Current Field Measurement (ACFM) Inspection
- Alternating Current Field Measurement (ACFM) Inspection
Radiographic Testing
Radiographic Testing
- Film
- Film
Electric
Electric
- Computed
- Computed
Magnetic Flux Leakage Inspection (Tank Floor Inspection)
Magnetic Flux Leakage Inspection (Tank Floor Inspection)
Combustion
Combustion
Hardness Testing Qualification
Hardness Testing Qualification
Induction
Induction
Positive Material Identification
Positive Material Identification
Radiographic Film Interpretation
Radiographic Film Interpretation
Long Range Guided Wave Testing
Long Range Guided Wave Testing
Ground Penetrating Radar Testing
Ground Penetrating Radar Testing